Safety Lines - Engineering Safety Newsletter - Index Issues 1-76
Index of past issues of Safety Lines
| Category | Title | Issue | Date |
|---|---|---|---|
| Accident administration | Accident investigation procedures | 8 | Jun-93 |
| Accident notification - M&I & SGS branch addresses | 11 | Dec-93 | |
| Accident notification - OSH branch addresses | 11 | Dec-93 | |
| Ammonia plant safety | 37 | Apr-98 | |
| Accreditation/ Certification | Accreditation & recognition of inspection bodies | 30 | Feb-97 |
| Adding value through accreditation of inspection bodies | 47 | Sep-00 | |
| Auditing - one consequence of draft regulations | 8 | Jun-93 | |
| Auditing and Safety Engineers | 72 | Dec-06 | |
| Certification bodies | 13 | May-94 | |
| Certification bodies & inspection bodies (recognised by OSH) | 25 | Apr-96 | |
| Certifying agencies to the ISO 9000X series of quality management's standards | 8 | Jun-93 | |
| First committee drafts for future ISO 9000 standards | 39 | Sep-98 | |
| New QS certification body | 18 | Feb-95 | |
| Telarc restructuring (IANZ and Telarc Ltd.) | 33 | Aug-97 | |
| Amusement devices | Entering new 'war' zones | 70 | Jun-06 |
| Inaugural Meeting of Amusement Device Certifiers | 75 | Nov-07 | |
| New amusement device - Scaling new heights | 69 | Mar-06 | |
| Not-so-new amusement device | 69 | Mar-o6 | |
| Santa's new transport? | 72 | Dec-06 | |
| Boilers | Accidents on steam plant and hot water systems | 24 | Feb-96 |
| Approved Code of Practice for the Design, Safe Operation, Maintenance and Servicing of Boilers | 25 | Apr-96 | |
| Back end gas temperatures for shell boilers manufactured and approved prior to 1982 | 32 | Jun-97 | |
| Boiler code update | 64 | Dec-04 | |
| Boiler ACoP clarification - Appendix D | 67 | Sep-05 | |
| Boiler Component Failure | 72 | Dec-06 | |
| Boiler COP Appendix C | 18 | Feb-95 | |
| Boiler fires | 49 | Mar-01 | |
| Boiler incident | 63 | Sep-04 | |
| Boiler incident (control failure of low pressure hot water boiler) | 14 | Jun-94 | |
| Boiler incidents (1989 to 1992) | 4 | Jul-92 | |
| Boiler operation records | 54 | Jun-02 | |
| Boiler operator qualifications | 43 | Sep-99 | |
| Boiler safety audits | 57 | Mar-03 | |
| Boiler treatment accident | 11 | Dec-93 | |
| Boilers - checklist, applications for limited or unattended operation | 12 | Feb-94 | |
| Boilers and pressure vessels: International harmonisation of codes and standards | 47 | Sep-00 | |
| Boilers Code - Applicability of Part 1 to Hot Water Boilers | 76 | Feb-08 | |
| Boilers not exceeding 6MW - Documented system | 62 | Jun-04 | |
| Chemical backflow | 15 | Aug-94 | |
| Defective gauge glass cock | 53 | Mar-02 | |
| Efficient production & use of steam (EECA's role) | 29 | Dec-96 | |
| Energy and chemical plant operation computer based training packages | 40 | Dec-98 | |
| Fatal boiler accident ("Model Engineer" vintage steam yacht June 1992) | 20 | Jun-95 | |
| Fire tube boiler furnace defects | 37 | Apr-98 | |
| Furnace tube deformation: Boiler maintenance - Water treatment & blowdown | 12 | Feb-94 | |
| Gas-fired boiler incident | 45 | Mar-00 | |
| Hot water boiler - Or not? | 70 | Jun-06 | |
| Hot water boilers | 21 | Aug-95 | |
| Hot water boilers | 29 | Dec-96 | |
| Industry group to consider draft boilers code of practice | 9 | Aug-93 | |
| Inspection of hot water boilers | 47 | Sep-00 | |
| Latest incident notes (internal surface cracking - brass non return valves) | 8 | Jun-93 | |
| Limited attendance & unattended boilers | 7 | Mar-93 | |
| Limited attendance & unattended boilers (Issue of draft for public comment) | 4 | Jul-92 | |
| Location of an unattended boiler in a process area | 52 | Dec-01 | |
| Maintaining safe boiler water levels | 28 | Oct-96 | |
| New code of practice | 12 | Feb-94 | |
| Operation of unattended boilers | 65 | Mar-05 | |
| OSH recognition policies | 17 | Dec-94 | |
| Pressure problems | 53 | Mar-02 | |
| Recognised Qualifications | 62 | Jun-04 | |
| Relocation of boilers | 35 | Dec-97 | |
| Report on fire tube boiler furnace tube collapse | 28 | Oct-96 | |
| Responsible person and boiler attendant training | 43 | Sep-99 | |
| Revised code of practice | 43 | Sep-99 | |
| Safety Alert (Under 15 HP boilers using time clocks) | 37 | Apr-98 | |
| Safety valves retrofitted to boilers | 48 | Dec-00 | |
| Scale on boiler level probes | 22 | Oct-95 | |
| Seizure of boiler relief valves | 40 | Dec-98 | |
| Shell Boilers - Longitudinal Seam Examination | 72 | Dec-06 | |
| Some D-type boilers were found to have potentially dangerous cracks in welds | 57 | Mar-03 | |
| Steam/hazardous gases group | 13 | May-94 | |
| Tube plate cracking-Fire tube boilers | 34 | Oct-97 | |
| Under 15 HP boilers | 35 | Dec-97 | |
| Under 15hp boilers | 19 | Apr-95 | |
| Water Drum Mismatch | 76 | Feb-08 | |
| Water hammer | 26 | Jun-96 | |
| Cranes | A crane | 43 | Sep-99 |
| Accident - Pillar crane pivot failure | 7 | Mar-93 | |
| Accident (slack mooring lines & portside crane operation) | 6 | Dec-92 | |
| Accident report (accidents 14/6/89 to 27/3/91) | 6 | Dec-92 | |
| Accident summary (30/3/91 to 21/5/94) | 18 | Feb-95 | |
| Accidents involving cranes | 39 | Sep-98 | |
| Approved code of practice for cranes | 49 | Mar-01 | |
| Approved Code of Practice for Cranes | 73 | Mar-07 | |
| Certification of cranes & crane operator training | 27 | Aug-96 | |
| Code of practice for cranes | 46 | Jun-00 | |
| Concrete Pumping | 73 | Mar-07 | |
| Conformity assessment of imported cranes | 60 | Dec-03 | |
| Crane Code Clarification | 73 | Mar-07 | |
| Crane Code Clarification | 74 | Jun-07 | |
| Crane code compliance | 58 | Jun-03 | |
| Crane controls upgrade | 43 | Sep-99 | |
| Crane emergency stop button | 58 | Jun-03 | |
| Crane hook failure | 47 | Sep-00 | |
| Crane luffing rope inspection | 68 | Dec-05 | |
| Crane operator training | 37 | Apr-98 | |
| Crane safety manual | 48 | Dec-00 | |
| Crane signals poster (PCA) | 29 | Dec-96 | |
| Cranes and lifting gear | 29 | Dec-96 | |
| Cranes code of practice | 6 | Dec-92 | |
| Cranes Code of Practice - Note on Electrical Protection | 75 | Nov-07 | |
| Cranes Code of Practice - Note on Electrical Protection (Amended) | 76 | Feb-08 | |
| Cranes Code of Practice - Standards Update | 75 | Nov-07 | |
| Cranes imported into NZ (documentation required) | 20 | Jun-95 | |
| Electrical protection - A crane consultants viewpoint | 44 | Dec-99 | |
| Gantry cranes: Operator certification course | 21 | Aug-95 | |
| Hoist cable failure | 6 | Dec-92 | |
| Imported mobile cranes | 41 | Mar-99 | |
| Inspection of wire ropes | 46 | Jun-00 | |
| Inspection procedure - ISO 4309 | 46 | Jun-00 | |
| Lift Radius Measurement - Mobile Cranes | 76 | Feb-08 | |
| Lifting equipment - A reminder about proof testing | 64 | Dec-04 | |
| Mobile crane incident - Low winch hydraulic pressure | 64 | Dec-04 | |
| Mobile crane slew rings | 42 | Jun-99 | |
| Non-rotating hoist wire rope multi-fall configurations | 34 | Oct-97 | |
| Overhead travelling cranes / mobile cranes | 31 | Apr-97 | |
| Pile driving cranes | 52 | Dec-01 | |
| Power Crane Association: Safety training courses | 21 | Aug-95 | |
| Prosecutions: mobile crane; under 750w service lift; & air receiver explosion | 2 | Feb-92 | |
| Radio control of cranes | 37 | Apr-98 | |
| Recognised qualifications | 62 | Jun-04 | |
| Re-machining crane slew ring ball paths | 28 | Oct-96 | |
| Rock solid? | 51 | Sep-01 | |
| Safety alert - Crane accident | 48 | Dec-00 | |
| Safety Alert - Favelle tower crane winch drive failure | 20 | Jun-95 | |
| Safety Alert: Crane maintenance (hydraulic mobile crane) | 32 | Jun-97 | |
| Safety Alert: Favco STD 1000 series cranes | 31 | Apr-97 | |
| Safety Alert: Kone XL 304 hoist unit | 33 | Aug-97 | |
| Self-erecting tower cranes | 52 | Dec-01 | |
| Self-erecting tower crane collapse | 64 | Dec-04 | |
| Telehandlers | 67 | Sep-05 | |
| Tower crane fall recovery | 58 | Jun-03 | |
| Truck loader crane fatal accident | 66 | Jun-05 | |
| Update for crane operators | 35 | Dec-97 | |
| Watch that wedge! | 50 | Jun-01 | |
| Design verification | AS 3920.1 Part 1:Pressure equipment manufacture type rating of steam | 34 | Oct-97 |
| Design verification | 16 | Oct-94 | |
| Design verification | 55 | Sep-02 | |
| Design verification - Clarifications | 66 | Jun-05 | |
| Design verification and fabrication inspection | 33 | Aug-97 | |
| Design verification of existing equipment | 20 | Jun-95 | |
| Design verifier accreditation | 26 | Jun-96 | |
| Design verifier certification | 27 | Aug-96 | |
| Design verifier certification | 33 | Aug-97 | |
| Design verifier certification | 36 | Feb-98 | |
| Design verifier recognition | 15 | Aug-94 | |
| Guidelines for the design verification of boiler management systems | 31 | Apr-97 | |
| Guidelines for the design verification of piping systems | 27 | Aug-96 | |
| Inspection bodies performing design verification | 38 | Jun-98 | |
| Inspection bodies performing design verification and design verifiers | 37 | Apr-98 | |
| List of principal references for design verification & inspection | 8 | Jun-93 | |
| NAFEMS registered analyst | 38 | Jun-98 | |
| New design verifying service | 32 | Jun-97 | |
| Newly certified design verifier | 24 | Feb-96 | |
| Newly certified design verifiers | 25 | Apr-96 | |
| Re-certification of design verifiers | 37 | Apr-98 | |
| Recognition of design verifier ( work on competency assessment) | 14 | Jun-94 | |
| Recognised qualifications | 62 | Jun-04 | |
| Registered design verification bodies & certified design verifiers | 23 | Dec-95 | |
| Registration of design verification body | 22 | Oct-95 | |
| Re-verification of existing designs (Engineering Safety Doc 013, CL 2.3) | 23 | Dec-95 | |
| Validity period of design verification certificates | 34 | Oct-97 | |
| Verification of inspection test plans | 25 | Apr-96 | |
| Elevated work platforms | CBIP EWP Certifier Process | 73 | Mar-07 |
| Elevated work platforms | 55 | Sep-02 | |
| Elevating work platforms - Competent person | 67 | Sep-05 | |
| Elevating work platforms - Major inspection | 58 | Jun-03 | |
| Elevating work platforms - Ten-yearly check-Up | 62 | Jun-04 | |
| Examinations | Assessors for steam plant and steam driven vehicle qualifications | 38 | Jun-98 |
| CBIP examination | 24 | 29/2/97 | |
| CBIP examinations (recognition by Engineering Safety as qualification issuing organisation) | 12 | Feb-94 | |
| CBIP examinations: July - October 1996 | 25 | Apr-96 | |
| Certificates in Energy & Chemical Plant (shift from LED qualifications to Enchem) | 24 | Feb-96 | |
| Energy & chemical plant process operators qualifications | 29 | Dec-96 | |
| Engine driver and steam plant qualifications | 38 | Jun-98 | |
| Exciting news from CBIP | 66 | Jun-05 | |
| Land engine driver administration | 17 | Dec-94 | |
| LED courses | 11 | Dec-93 | |
| LED exam dates, 1994 | 11 | Dec-93 | |
| LED exam reminders (1994 exam dates) | 13 | May-94 | |
| LED examinations (dates for 1992) | 3 | Apr-92 | |
| LED exams (August 1993) Use of tables in LED Exams | 8 | Jun-93 | |
| LED exams (deadline for receiving applications) | 5 | Sep-92 | |
| LED exams November 1993 (telephone inquiries) | 9 | Aug-93 | |
| LED qualifications (phasing out of LED Exams) | 2 | Feb-92 | |
| NZQA & LED exams (repeal of BLC Act) | 7 | Mar-93 | |
| NZQA progress regarding LED exams | 16 | Oct-94 | |
| Qualifications for the New Zealand crane industry | 32 | Jun-97 | |
| Study towards boiler attendant & land engine driver qualifications | 7 | Mar-93 | |
| Study towards LED qualifications | 15 | Aug-94 | |
| Testing the pressure | 49 | Mar-01 | |
| Forklift | 2002 National forklift competition | 56 | Dec-02 |
| 2003 National forklift competition | 60 | Dec-03 | |
| 2004 National Forklift Drivers' Competition | 63 | Sep-04 | |
| Forklift Training Transferring to ITO | 73 | Mar-07 | |
| Forklift wheel explosion | 65 | Mar-05 | |
| Forklifts used as cranes | 53 | Mar-02 | |
| Hat trick for current forklift champion | 64 | Dec-04 | |
| National forklift drivers' competition 2001 | 52 | Dec-01 | |
| General Safety | A gag on safety | 45 | Mar-00 |
| Asbestos replacement in industry | 61 | Mar-04 | |
| ASME approves AS 1548 steel | 61 | Mar-04 | |
| Avoidance of galvanic corrosion between stainless steel bolts and aluminium members | 70 | Jun-06 | |
| Brittle fracture of ASTM A 105 flanges | 59 | Sep-03 | |
| Building maintenance unit (BMU) incident | 51 | Sep-01 | |
| Chartered professional engineers | 64 | Dec-04 | |
| Conflict of interest | 60 | Dec-03 | |
| Defective fittings | 55 | Sep-02 | |
| Friction anchors and tilt-up concrete panels | 58 | Dec-03 | |
| Guidelines for the prevention of falls | 48 | Dec-00 | |
| Ladder safety tests | 63 | Sep-04 | |
| Lockout - Safe practices for isolation of all sources of energy | 63 | Sep-04 | |
| Media Release: Dangers with gas-fired ovens | 45 | Mar-00 | |
| Miscellaneous incidents | 69 | Mar-06 | |
| Precast concrete anchors - Notice | 64 | Dec-04 | |
| Research reports | 58 | Jun-03 | |
| Safety valves - A message for controllers | 48 | Dec-00 | |
| Swaged ropes | 54 | Jun-02 | |
| Traction engine safety | 51 | Sep-01 | |
| When it comes to safety, IEC 61508 has it covered | |||
| Inspection | AIES membership available to Kiwis | 42 | Jun-99 |
| All Areas Inspections | 43 | Sep-99 | |
| ASME stamping | 69 | Mar-06 | |
| Australian inspection body | 42 | Jun-99 | |
| Australian NDT personnel employed in new Zealand | 42 | Jun-99 | |
| Calibration of inspection and test equipment | 41 | Mar-99 | |
| CE marking of pressure equipment | 67 | Sep-05 | |
| CE Marking of Pressure Equipment | 71 | Sep-06 | |
| Certificate of Inspection - Change of Controller | 71 | Sep-06 | |
| Certification of previously exempt equipment | 49 | Mar-01 | |
| Cherry pickers - Documentation and five- and ten-yearly examinations | 54 | Jun-02 | |
| Comparison of European and Australian pressure equipment conformity assessment criteria | 38 | Jun-98 | |
| Congratulations SGS! | 52 | Dec-01 | |
| Dismantling, servicing & testing of safety valves (hot water boiler) | 30 | Feb-97 | |
| Duty to report unsafe equipment | 34 | Oct-97 | |
| Endorsed certificates of inspection and inspection bodies | 46 | Jun-00 | |
| Equipment Inspection and Effective Supervision | 74 | Jun-07 | |
| Equipment upgrades - Required tests | 68 | Dec-05 | |
| Exemption - Trainee equipment inspectors | 65 | Mar-05 | |
| Existing inspection bodies | 13 | May-94 | |
| Expiry of CBIP certificates | 31 | Apr-97 | |
| Extended inspection periods to AS/NZS 3788 | 38 | Jun-98 | |
| Extension of inspection periods | 19 | Apr-95 | |
| Fabrication hold points and equipment inspection | 36 | Feb-98 | |
| Inspection bodies | 48 | Dec-00 | |
| Inspection body | 34 | Oct-97 | |
| Inspection body | 33 | Aug-97 | |
| Inspection body accreditation | 39 | Sep-98 | |
| Inspection body advisory committee | 39 | Sep-98 | |
| Inspection body recognition process | 56 | Dec-02 | |
| Inspection body support services | 44 | Dec-99 | |
| Inspection certificates and inspection reports | 41 | Mar-99 | |
| Inspection marks: SGS | 15 | Aug-94 | |
| Inspection of hot water boilers | 47 | Sep-00 | |
| Inspection periods | 7 | Mar-93 | |
| List of principal references for design verification & inspection | 8 | Jun-93 | |
| Manufacturer's Data Reports | 21 | Aug-95 | |
| Material impact test temperature | 57 | Mar-03 | |
| NDT report concerns | 69 | Mar-06 | |
| NDT reports: TELARC | 13 | May-94 | |
| New IIO authorisation for SGS | 9 | Aug-93 | |
| New inspection bodies | 49 | Mar-01 | |
| New inspection body | 24 | 29/2/97 | |
| New inspection body | 29 | Dec-96 | |
| New inspection body | 17 | Dec-94 | |
| New inspection periods for equipment | 7 | Mar-93 | |
| New recognised inspection body | 51 | Sep-01 | |
| Overseas inspection body | 41 | Mar-99 | |
| Preparing for annual lift inspections | 44 | Dec-99 | |
| Pressure equipment and the borderless market | 36 | Feb-98 | |
| Pressure testing of equipment and setting of safety valves | 53 | Mar-02 | |
| Protection and inspection of safety valves | 44 | Dec-99 | |
| Re-certification of equipment inspectors | 34 | Oct-97 | |
| Recognised inspection bodies | 46 | Jun-00 | |
| Recognised inspection bodies | 50 | Jun-01 | |
| Recognised inspection bodies | 54 | Jun-02 | |
| Recognition of overseas inspection bodies | 35 | Dec-97 | |
| Recognised qualifications | 62 | Jun-04 | |
| Relief valve inspection and testing | 66 | Jun-05 | |
| Scope of inspection | 65 | Mar-05 | |
| Servicing, maintenance, testing and inspection of relief valves | 34 | Oct-97 | |
| SGS branch approvals | 13 | May-94 | |
| Trainee equipment inspectors | 36 | Feb-98 | |
| Legislation | "All practicable steps" (HSE Act) | 16 | Oct-94 |
| All practicable steps | 70 | Jun-06 | |
| Approved code of practice for passenger ropeways in New Zealand | 41 | Mar-99 | |
| Boilers, Lifts & Cranes Act (BLC) Act 1950 | 68 | Dec-05 | |
| Boilers, Lifts & Cranes Act 1950 (effect when HSE Bill is introduced) | 2 | Feb-92 | |
| Certification of previously exempt equipment | 49 | Mar-01 | |
| Change of name for regulations | 15 | Aug-94 | |
| Cold water pressure vessels and pipework - Exemption | 67 | Sep-05 | |
| Controllers and Bailees | 44 | Dec-99 | |
| Definitions of personnel | 20 | Jun-95 | |
| Deregulation | 2 | Feb-92 | |
| Deregulation | 3 | Apr-92 | |
| Designated Design Life | 72 | Dec-06 | |
| Distribution of new draft regulations | 16 | Oct-94 | |
| Documents and standards for use with draft Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 25 | Apr-96 | |
| Documents and standards for use with the draft Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Regulations | 40 | Dec-98 | |
| Draft Hazardous Equipment Regulations | 13 | May-94 | |
| Draft Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations (progress with & "controller obligations") | 18 | Feb-95 | |
| Draft Requirements - Proposed to replace the Boilers, Lifts and Cranes Act | 7 | Mar-93 | |
| Draft requirements (To replace Boilers, Lifts and Cranes Act) | 6 | Dec-92 | |
| Exemption - Trainee equipment inspectors | 65 | Mar-05 | |
| Exemptions from the PECPR Regulations | 74 | Jun-07 | |
| Good news for exporters to Europe | 41 | Mar-99 | |
| Guide to the Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Regulations | 16 | Oct-94 | |
| Hazardous Equipment Regulations & Oil & Gas Plant | 10 | Oct-93 | |
| Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 work with industry groups to replace the Boilers, Lifts & Cranes Act 1950. | 1 | Nov-91 | |
| HSE Act - Principals and contractors | 70 | Jun-06 | |
| HSE Act (to come into force on /1993 | 6 | Dec-92 | |
| HSE Bill | 2 | Feb-92 | |
| HSE Bill (with Labour Select Committee) | 3 | Apr-92 | |
| Legal status of documentation (relating to equipment covered by Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Regulations) | 22 | Oct-95 | |
| Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Regulations - Clarification: Hydraulic systems | 55 | Sep-02 | |
| Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Regulations: Further definitions - equipment,- manufacturers,- controllers. | 17 | Dec-94 | |
| Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Relationships (Schematic) | 19 | Apr-95 | |
| Pressure Equipment, Cranes and Passenger Ropeways Regulations update | 42 | Jun-99 | |
| Proposed requirements (Draft discussion documents) | 3 | Apr-92 | |
| Quality management systems - An update | 50 | Jun-01 | |
| Recognition of documents | 67 | Sep-05 | |
| Recognition of standards under the Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Regulations | 43 | Sep-99 | |
| Regulations update | 16 | Oct-94 | |
| Revised standard for the transport of dangerous goods on land | 41 | Mar-99 | |
| Safety of pressure equipment and passenger ropeways | 9 | Aug-93 | |
| Schedule Y equipment | 7 | Mar-93 | |
| Shopping for the Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 Regulations | 43 | Sep-99 | |
| Traction engine regulations | 68 | Dec-05 | |
| Transitional arrangements for certificates of inspection | 9 | Aug-93 | |
| Trans-Tasman Mutual Recognition Act | 37 | Apr-98 | |
| Trans-Tasman Mutual Recognition Arrangement | 43 | Sep-99 | |
| Update | 40 | Dec-98 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 22 | Oct-95 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 24 | 29/2/97 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 29 | Dec-96 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 30 | Feb-97 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 31 | Apr-97 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 26 | Jun-96 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 27 | Aug-96 | |
| Update - Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 regulations | 28 | Oct-96 | |
| Update: Pressure Equipment, Cranes and Passenger Ropeways Regulations | 38 | Jun-98 | |
| When a controller refuses to carry out repairs recommended by an inspection body | 45 | Mar-00 | |
| Lifts | Accidents (lift accidents reported 1989 - 1992) | 3 | Apr-92 |
| Building Act 1991 (effects when it comes into force on 15/2/92) | 2 | Feb-92 | |
| Code of practice for the New Zealand lift industry | 45 | Mar-00 | |
| Identification of roll over protective structures | 59 | Sep-03 | |
| Lift accident (Operating when overloaded) | 4 | Jul-92 | |
| New Zealand Power Lift Rules - legal responsibilities during transition to Building Act 1991 | 5 | Sep-92 | |
| Platform lift accident | 59 | Sep-03 | |
| Power lift rules under new management from April (1993) | 8 | Jun-93 | |
| Qualification/certification of lift inspectors | 20 | Jun-95 | |
| Miscellaneous | CBIP Minutes | 72 | Dec-06 |
| CBIP - Interim Agreement | 75 | Nov-07 | |
| OSH/Engineering Safety | Au revoir | 20 | Jun-95 |
| Au revoir | 21 | Aug-95 | |
| Availability of archive files for equipment | 45 | Mar-00 | |
| Business (more or less) as usual | 71 | Sep-06 | |
| Christmas greetings (office closure) | 23 | Dec-95 | |
| Farewell Bryn George | 74 | Jun-07 | |
| Farewell to Wendy | 15 | Aug-94 | |
| Farewell: John Buxton | 42 | Jun-99 | |
| Farewell: Mato Dugalic | 46 | Jun-00 | |
| Generic DoL brand | 67 | Sep-05 | |
| GM comment on John Stark's retirement | 26 | Jun-96 | |
| John Stark retires (12 July 1996) | 26 | Jun-96 | |
| Location of OSH: Aurora House | 10 | Oct-93 | |
| National Support Manager - Appointment | 75 | Nov-07 | |
| New engineer surveyor | 16 | Oct-94 | |
| New safety engineer | 48 | Dec-00 | |
| New Year's greeting | 18 | Feb-95 | |
| OSH on the internet | 34 | Oct-97 | |
| OSH presence on the internet | 30 | Feb-97 | |
| OSH presence on the internet | 29 | Dec-96 | |
| OSH strategic focus | 29 | Dec-96 | |
| OSH trademark | 42 | Jun-99 | |
| Safety Engineers on the Move | 74 | Jun-07 | |
| Season's greetings | 17 | Dec-94 | |
| Staff notes | 30 | Feb-97 | |
| Staff notes new safety engineers | 22 | Oct-95 | |
| We have moved from Ministry of Transport to Department of Labour | 8 | Jun-93 | |
| WorkSafe Week 2000 is "On the Job" | 47 | Sep-00 | |
| WorkSafe Week 98 | 39 | Sep-98 | |
| Year 2000 and the millennium bug | 40 | Dec-98 | |
| Pressure equipment | Used Import Pressure Equipment | 73 | Mar-07 |
| Hydraulic In-situ Testing of Safety Valves | 76 | Feb-08 | |
| Pressure piping | Air line shatters in workshop | 16 | Oct-94 |
| Ammonia refrigeration pipework (ASME B31.5) | 31 | Apr-97 | |
| Failure of pressure piping - leak after corrosion | 5 | Sep-92 | |
| Pipe fittings (serious fault) | 4 | Jul-92 | |
| Piping regulations | 12 | Feb-94 | |
| Plastic pipe for pressure applications | 40 | Dec-98 | |
| Plastic Pipe for Pressure Applications | 76 | Feb-08 | |
| Pressure piping | 13 | May-94 | |
| Pressure piping compliance requirements | 59 | Sep-03 | |
| Refrigeration pipework | 41 | Mar-99 | |
| Recognised Qualifications | 62 | Jun-04 | |
| Refrigeration pipework (Engineering Safety.Doc 001: ANSI B31.5 and AS4041 1992) | 25 | Apr-96 | |
| Refrigeration piping systems | 18 | Feb-95 | |
| Steam Pipe Failure | 73 | Mar-07 | |
| Waterhammer in steam pipework | 40 | Dec-98 | |
| Pressure vessels | Air compressing plant | 36 | Feb-98 |
| Air receiver standards | 4 | Jul-92 | |
| Air receivers | 52 | Dec-01 | |
| Bitumen tank explosion | 42 | Jun-99 | |
| Boilers and pressure vessels: International harmonisation of codes and standards | 47 | Sep-00 | |
| BS EN 286: Part 1: 1991 (error in clause 6.4.8, line 4, "smaller" should read as "greater" | 5 | Sep-92 | |
| Calorifier rupture - a near miss | 41 | Mar-99 | |
| CE marking of pressure equipment | 67 | Sep-05 | |
| Code of practice for pressure equipment | 47 | Sep-00 | |
| Cold stretched pressure vessels | 39 | Sep-98 | |
| Do you have one of these? | 50 | Jun-01 | |
| Hindin BX-400 safety notice | 19 | Apr-95 | |
| Hot water boiler - Or not? | 70 | Jun-06 | |
| ICPVT-10 | 53 | Mar-02 | |
| Is it a pressure vessel? | 48 | Dec-00 | |
| Near miss accident (stub pipe to safety valve sheared off) | 28 | Oct-96 | |
| New pressure vessel code of practice | 51 | Sep-01 | |
| NZS BS 5500 Specification for unfired fusion welded pressure vessels | 39 | Sep-98 | |
| Portable tyre inflation cylinders | 21 | Aug-95 | |
| Pressure discharge bulk transport vessel explodes under pressure | 44 | Dec-99 | |
| Pressure vessel heads | 53 | Mar-02 | |
| Recognised Qualifications | 62 | Jun-04 | |
| Safety Alert: Owners/users of aluminium air receivers | 39 | Sep-98 | |
| Small pressure vessels (alternative standards) | 20 | Jun-95 | |
| Tenth International Conference on Pressure Vessel Technology | 49 | Mar-01 | |
| Using finite element analysis with vessel design codes | 39 | Sep-98 | |
| Quality Management | 3rd Metals Industry Conference | 71 | Sep-06 |
| Equipment inspection within a QMS | 26 | Jun-96 | |
| Equipment inspection within a QMS | 27 | Aug-96 | |
| Quality management system (QMS) audits | 24 | Feb-96 | |
| Quality management system recognition | 16 | Oct-94 | |
| Quality management systems for boiler installations | 9 | Aug-93 | |
| Quality standards | 6 | Dec-92 | |
| Refrigeration | Over pressure protection - refrigerant receivers | 10 | Oct-93 |
| Solenoid valve failure on ammonia duty | 10 | Oct-93 | |
| Safety Lines | "Safety Lines" circulation | 11 | Dec-93 |
| Call for articles for "Safety Lines" from readers | 27 | Aug-96 | |
| Correction to Safety Lines issue 54 | 55 | Sep-02 | |
| Correction to Safety Lines issue 55 | 56 | Dec-02 | |
| Correction to Safety Lines issue 57 | 58 | Jun-03 | |
| Correction to Safety Lines issue 59 | 60 | Dec-03 | |
| Corrections to Safety Lines | 51 | Sep-01 | |
| Erratum ("Safety Lines" No.24 LED qualifications - Enchem Levels 2 and 4) | 25 | Apr-96 | |
| Erratum ("Safety Lines" No.25, NZS 1545 may be substituted by BS 2853: 1957) | 26 | Jun-96 | |
| Future publications of Safety Lines | 38 | Jun-98 | |
| Live Safety Lines amendments | 51 | Sep-01 | |
| New format for "Safety Lines" | 5 | Sep-92 | |
| New format for "Safety Lines" | 21 | Aug-95 | |
| Safety issues for "Safety Lines" | 35 | Dec-97 | |
| Short Notes (error in "Safety Lines" 25 ref. NZBC Pt 11, & issue of ES Doc.001) | 28 | Oct-96 | |
| Standards/Codes | Application of new standards to equipment | 69 | Mar-06 |
| Approved code of practice | 54 | Jun-02 | |
| Approved code of practice for cranes | 49 | Mar-01 | |
| Approved Code of Practice for Passenger Ropeways in New Zealand - Amendment 1 | 57 | Mar-03 | |
| AS 1210 Supplement 2 -1999 | 44 | Dec-99 | |
| AS/NZS 3788 In-service inspection and inspection periods | 33 | Aug-97 | |
| AS3920.1-1993: Amendment 1 | 23 | Dec-95 | |
| Australian Standards (Re circular letter) | 5 | Sep-92 | |
| B31.1 Power Piping - Code case 168 | 37 | Apr-98 | |
| Boiler ACoP clarification - Appendix D | 67 | Sep-05 | |
| Boiler Code Update | 64 | Dec-04 | |
| Boilers and pressure vessels: International harmonisation of codes and standards | 47 | Sep-00 | |
| Code of practice for cranes | 46 | Jun-00 | |
| Code of practice for passenger ropeways | 34 | Oct-97 | |
| Code of practice for pressure equipment | 44 | Dec-99 | |
| Code of practice for pressure equipment | 45 | Mar-00 | |
| Code of practice for pressure equipment | 47 | Sep-00 | |
| Code of practice for the New Zealand lift industry | 45 | Mar-00 | |
| Codes of practice - Status update | 61 | Mar-04 | |
| Competent person | 56 | Dec-02 | |
| Confined space safety | 35 | Dec-97 | |
| Cranes code of practice - A reminder | 51 | Sep-01 | |
| Critical parts (Sourcing spare parts) | 16 | Oct-94 | |
| Engineering Notice index (February 1994) | 12 | Feb-94 | |
| Engineering Safety Document #15 | 15 | Aug-94 | |
| Engineering Safety Notice circulars | 7 | Mar-93 | |
| Equipment imported into NZ (documentation requirements) | 25 | Apr-96 | |
| Engineering Safety Doc 012 Issue 2 | 14 | Jun-94 | |
| Engineering Safety Doc index (June 1994) | 14 | Jun-94 | |
| Engineering Safety Doc.013 issue 2 | 13 | May-94 | |
| Engineering Safety Doc's mailed with "Safety Lines" | 10 | Oct-93 | |
| Insuring Pressure Equipment Safety - Revised Standard | 71 | Sep-06 | |
| Extremes of temperature | 37 | Apr-98 | |
| Guide to statutory requirements for pressure equipment in Australia and New Zealand | 33 | Aug-97 | |
| Inspection bodies, equipment inspectors and design verifiers (New standards) | 33 | Aug-97 | |
| ISO Standards on-line | 48 | Dec-00 | |
| Joint AS/NZS Boiler Code | 10 | Oct-93 | |
| Joint Australia/New Zealand pressure equipment code | 9 | Aug-93 | |
| Joint Australian - New Zealand pressure equipment standard | 14 | Jun-94 | |
| Major Hazard Facilities - Comment on AS 4343 | 75 | Nov-07 | |
| Management of noise (OSH resource kit)) | 30 | Feb-97 | |
| Management of substances hazardous to health | 37 | Apr-98 | |
| Minor Changes to Equipment | 74 | Jun-07 | |
| NDT: Revision of Engineering Safety Doc 015 | 16 | Oct-94 | |
| New AS/NZS ISO 9001:2000 Standard | 49 | Mar-01 | |
| New Engineering Safety Doc (Engineering Safety Doc.021) | 26 | Jun-96 | |
| New NFPA Standard | 50 | Jun-01 | |
| New pressure vessel code of practice | 51 | Sep-01 | |
| New Service from Standards New Zealand | 35 | Dec-97 | |
| New Standard: AS/NZS 1891.3:1997 Industrial fall arrest systems and devices | 35 | Dec-97 | |
| New Zealand Standards: Bits and pieces | 48 | Dec-00 | |
| New Zealand Standards: Designation | 47 | Sep-00 | |
| Of codes and things | 60 | Dec-03 | |
| Passenger ropeways - Canadian standard | 69 | Mar-06 | |
| Pressure equipment - Standards for inspection bodies and their inspectors | 30 | Feb-97 | |
| Proposed amendment to AS 1548-1995 | 37 | Apr-98 | |
| Proposed boiler code amendment | 59 | Sep-03 | |
| References for design verification and inspection | 12 | Feb-94 | |
| Regulatory & standards requirements for pressure equipment (Seminar) | 21 | Aug-95 | |
| Replacement of BS 5500 Specification for unfired pressure vessels | 44 | Dec-99 | |
| Revision of Australian pressure equipment standards | 32 | Jun-97 | |
| Revision of ISO 9000 Series Quality Management System Certification Standards | 45 | Mar-00 | |
| Revisions to quality standards | 12 | Feb-94 | |
| Short notes (BS752 & ES Doc 001) | 27 | Aug-96 | |
| Short Notes: AS/NZS1200 & AS3920.1 | 30 | Feb-97 | |
| Standards on the web | 46 | Jun-00 | |
| Update of AS3920.1 | 35 | Dec-97 | |
| Update of AS3920.1-1993 Assurance of Product Quality. Part 1 | 31 | Apr-97 | |
| Update on other "Lifting" approved codes of practice | 49 | Mar-01 | |
| Welding Standards (BS EN 287 & BS EN 288) | 4 | Jul-92 | |
| Surveys | Client surveys | 5 | Sep-92 |
| Engineering Safety and Safety Lines readership survey results 2001 | 53 | Mar-02 | |
| Swift survey | 31 | Apr-97 | |
| Swift survey (May 1996) | 25 | Apr-96 | |
| Swift survey (May 1998) | 37 | Apr-98 | |
| Swift survey 1996 comments | 26 | Jun-96 | |
| Swift survey and Safety Lines readership survey 2000 | 46 | Jun-00 | |
| Swift survey and Safety Lines readership survey results 1999 | 42 | Jun-99 | |
| Swift survey results (April 1993) | 8 | Jun-93 | |
| Swift survey results (April 1996) | 26 | Jun-96 | |
| Swift survey results (June 1994) | 15 | Aug-94 | |
| Swift survey results (June 1998) | 38 | Jun-98 | |
| Swift survey results (May 1995) | 21 | Aug-95 | |
| Swift survey results (May 1997) | 32 | Jun-97 | |
| Training | A New Zealand Energy Road Map | 43 | Sep-99 |
| Correct postal address (New Zealand Maritime School, Manukau Polytechnic) | 25 | Apr-96 | |
| Effective supervision | 66 | Jun-05 | |
| International pressure vessel conference (Dusseldorf) | 2 | Feb-92 | |
| Ninth International Conference on Pressure Vessel Technology | 31 | Apr-97 | |
| Website | New Engineering Safety website | 55 | Sep-02 |
| Visit us on the web | 56 | Dec-02 | |
| Web article replaces Safety Lines article | 58 | Jun-03 | |
| Web is one | 59 | Sep-03 | |
| Welding | Approval of weld procedures and approval testing of welders | 8 | Jun-93 |
| Approval of welder testing and weld procedures | 10 | Oct-93 | |
| International welding exhibition (Aotea Centre, Auckland 5-7 Feb 1996 | 22 | Oct-95 | |
| Welding standards (BS EN 287 & BS EN 288) | 4 | Jul-92 | |
| Welding tip (Approvals to multiple standards) | 29 | Dec-96 |
Issued by the Department of Labour, New Zealand
http://www.osh.dol.govt.nz
